The shipping platform

manage your shipping data, trade and automate work-flows
Puerto Dock Sud (Argentina)
-34.6500° / -58.3333° Latitude / Longitude

Port Restrictions

Max beam: 32

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

General overview: Puerto Dock Sud is a subport of Buenos Aires. It consists of 4 terminals: - Gas Carrier Terminal (Operated by YPF Gas) LOA 220m // Depth 9m // 45,000DWT - Tanker Basin (3 Operators // Shell, YPF, DAPSA) - Shell berths: A' (prima), A, B - YPF berths: C and F - DAPSA berth: E LOA 230m // 55,000DWT // Beam 32) - Section 1 - East Side (LOA 180m) Vessels berth in turning basin to load/discharge chemicals Orvol, Tagsa pipelines and tanks, - West side (Exolgan Container Terminal) Can accommodate 3 vessels (LOA 273m // Beam 42m // Depth 11.9m) Handling Equipment: - Gantry Cranes - 30 RTGs (40t) - 13 Reach Stackers (45t) - 14 Forklifts - Section 2 East side (For Petroleum, chemicals West side (For Bulk & General cargo, fruit)

SERVICE PROVIDERS

Port Agency

AVAILABLE FACILITIES

  • Break Bulk
  • Container
  • Liquid
  • Dry Bulk
  • LPG
  • Bunkering
  • LNG

AVAILABLE WAREHOUSES

  • Grain
  • Chemicals
  • Dry bulk (ore, coal, etc)
  • Liquid
  • General cargo
  • Reefer cargo
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Wed 18
forecast-image
14 - 20°C
19.8 km/h
Earrow
%
Thu 19
forecast-image
14 - 18°C
24.5 km/h
NNEarrow
100%
Today
forecast-image
14 - 21°C
14.4 km/h
ENEarrow
0%
Sat 21
forecast-image
14 - 22°C
24.1 km/h
NEarrow
74%
Sun 22
forecast-image
17 - 24°C
24.8 km/h
SEarrow
81%
Mon 23
forecast-image
15 - 17°C
33.1 km/h
SEarrow
89%
Tue 24
forecast-image
14 - 19°C
33.1 km/h
SSEarrow
0%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
MSC VITA
Position9702089 / CONT

110,800 MT

2015

Alemoa Terminal
9/17/2024 02:39
Buenos Aires
9/19/2024 05:45
MARIA EMILIA LV
Position9680035 / TANK

7,115 MT

2014

Santa Fe
9/17/2024 11:54
Puerto Dock Sud
9/18/2024 11:45
PUNTA MOGOTES
Position9353890 / TANK

13,147 MT

2007

Zona Comun Anch
9/13/2024 16:17
La Plata
9/16/2024 21:00
CABO VIRGENES
Position9253753 / TANK

69,554 MT

2002

Puerto Dock Sud
9/20/2024 03:49
Iona
9/20/2024 11:00
J C BAZAN
Position9473937 / TANK

17,567 MT

2009

Buenos Aires
8/31/2024 06:27
Buenos Aires
9/4/2024 09:00
CAP SAN ANTONIO
Position9622241 / CONT

128,653 MT

2014

Paranagua
9/17/2024 11:35
Buenos Aires
9/19/2024 09:00
VIEIRASA 17
Position8515116 / PASS

799 MT

1985

Deseado
8/15/2024 02:40
Buenos Aires
8/19/2024 20:00
BESIKTAS GH
Position9654971 / TANK

9,212 MT

2013

Rio Grande
9/18/2024 08:15
San Martin
9/21/2024 01:00
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...