The shipping platform

manage your shipping data, trade and automate work-flows
La Coruna (Spain)
ESLCG UN LOCODE
43.3500° / -8.4000° Latitude / Longitude

Port Restrictions

Max draft: 16

Max DWT: 164,028

Mean Tide: 4

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: La Coruna is S of the 3 major inlets which lie between Punta Priorino Grande (43°28'N 008°21'W) and Punta Herminio (5nm SW) in Galicia, NW Spain. General overview: La Coruna, situated on the W side of the Ria de La Coruna inlet, provides safe and sheltered accommodation for vessels up to 16.0m draught. It is equipped to handle general cargo and bulk solid and liquid cargos and is a major fishing industry base. It has a total quay length 8,458m, with usage divided among commercial, fishing and marina operations. Outer Port (43°21.0'N 008°30.5'W) a deep water port, is currently under construction for general, dry bulk and tankers up to 300,000DWT. The port is expected to handle its first vessels by 4Q2012 and will gradually replace the city port for the above cargo types, containers will continue to handled in the city port. The Sheltering Dock at the Port of A Coruna is 1.3 thousand meters long with alongside depth of 19 meters. It is used primarily by small and leisure crafts and contains the Harbor Master’s office and Sea Traffic Control Tower as well as the Nautical School Club Hall, the Red Cross Base, and the Laboratory and Aquarium of the Oceanographic Institute. The Port of A Coruna’s Marina Tidal Basin’s dock is 420 meters long with alongside depth of 3 meters. It is used by leisure boats and coastal fishing vessels, and it contains 10 quays and 353 spaces for vessels. The Marina Tidal Basin houses the port authority and tourism offices. The Liners Dock is 484 meters long with alongside depth of 11 meters. It is the passenger vessel dock and houses the passenger terminal and leisure center, El Puerto, and the Congress Center, Palexco. The Port of A Coruna’s Battery Dock is 277 meters long with alongside depth of from 5.5 to 7 meters. The Battery Dock serves handling of general goods, specialized bulk cargoes, and roll-on/roll-off traffic. It houses many buildings serving the industries that ship these goods. The North Calvo Sotelo Dock is 220 meters long with alongside depth of from 7 to 10 meters. Used to transport general goods, it contains a cold-storage fruit terminal and water and electric connections. The South Calvo Sotelo Dock is 420 meters long with alongside depth of from 7 to 10 meters. The dock serves general goods and specialized bulk cargoes. It also contains cold storage installations for fruit with water and electrical connections and facilities for pumping oils, fats, and vegetable oils. The North Centenary Dock is 639 meters long with alongside depth of 16.5 meters. The dock handles solid bulk and general goods. The South Centenary Dock is 450 meters long with alongside depth of 11 meters, and it handles solid bulk and general cargoes. The West Centenary Dock, at 150 meters long with alongside depth of 10 meters, handles general goods and containers. It contains a container terminal. The San Diego Dock is 665 meters long with alongside depth of 10 meters. It handles bulk cargoes and offers cold storage facilities. It also contains a coke-loading bay. The Oil Terminal Docks are 1080 meters long with alongside depth of from 11 to 16 meters. They can accommodate vessels from 45 thousand to 60 thousand tons carrying naphtha, propylene, gasoline, gas and fuel oils, crude oil, and kerosene. The Linares Rivas Dock, at 470 meters long with alongside depth of 8 meters, serves the fishing fleet. The dock houses fish markets and facilities for preparing and canning fish. The A Palloza Dock is 375 meters long with alongside depth of from 6 to 8 meters, and it also serves the fishing fleet. The East Dock, at 365 meters long with alongside depth of 6 meters, serves general goods and fishing activities. The dock contains cold storage facilities. Traffic figures: Approx 1,571 vessels, 12,848,590t of cargo, 7,920TEU and 64,731 passengers handled annually. Load line zone: North Atlantic Winter Seasonal Zone II, Winter Nov 1 to Mar 31, Summer Apr 1 to Oct 31. Max size: Draught 16.0m (Bulk) 15.5m (Oil), 150,000DWT. the largest vesse lcalled at the port: LOA: 348 m, draught: 14.6 m, deadweight: 164,028 t.

AVAILABLE FACILITIES

  • Break Bulk
  • Container
  • Liquid
  • Dry Bulk
  • Passenger
  • Multipurpose
  • Ro-Ro
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Wed 18
forecast-image
16 - 24°C
32.8 km/h
NEarrow
%
Thu 19
forecast-image
14 - 22°C
17.6 km/h
NNEarrow
%
Today
forecast-image
13 - 20°C
9.4 km/h
NNWarrow
88%
Sat 21
forecast-image
14 - 18°C
9 km/h
WNWarrow
89%
Sun 22
forecast-image
13 - 19°C
10.8 km/h
NWarrow
75%
Mon 23
forecast-image
13 - 19°C
14.8 km/h
SSWarrow
86%
Tue 24
forecast-image
15 - 20°C
22 km/h
SSWarrow
86%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
BOMAR VENUS
Position9374014 / TANK

6,180 MT

2006

Antwerp
9/15/2024 18:59
La Coruna
9/18/2024 20:00
URA
Position9436252 / MPP

6,801 MT

2009

Casablanca
9/10/2024 13:00
La Coruna
9/17/2024 09:00
SEASHARK
Position9298193 / TANK

32,302 MT

2004

Huelva
9/16/2024 06:48
La Coruna
9/18/2024 06:00
MANISA CAMILLA
Position9362669 / MPP

8,098 MT

2006

Figueira da Foz
9/18/2024 08:05
La Coruna
9/19/2024 18:00
WILSON FEDJE
Position9491757 / MPP

4,501 MT

2012

Setubal
9/18/2024 10:30
Ferrol
9/20/2024 00:01
VERTOM PATTY
Position9938729 / MPP

7,281 MT

2022

Jorf Lasfar
9/12/2024 09:44
La Coruna
9/15/2024 17:00
NORDBORG
Position9148180 / MPP

3,714 MT

1999

Ferrol
9/19/2024 22:00
Figueira da Foz
9/21/2024 06:00
COOL EXPLORER
Position9640023 / TANK

81,893 MT

2015

Mugardos
9/10/2024 04:47
Ferrol
9/10/2024 08:00
MN CALAO
Position9642394 / MPP

12,026 MT

2013

La Rochelle-Pallice
9/3/2024 18:38
Ferrol
9/5/2024 13:45
PLANNED CARGOES
CARGO
WEIGHT/VOLUME
DISCHARGING
LAYCAN
Petcoke
20,000 MT/---
9/9/24 - 9/25/24
Petcoke
20,000 MT/---
9/9/24 - 9/25/24
Petcoke
20,000 MT/---
9/9/24 - 9/25/24
Petcoke
20,000 MT/---
9/9/24 - 9/25/24
Petcoke
20,000 MT/---
9/9/24 - 9/25/24
Petcoke
20,000 MT/---
9/9/24 - 9/25/24
Petcoke
20,000 MT/---
9/9/24 - 9/25/24
Ethanol
---/5,000 CBM
9/9/24 - 9/23/24
Ethanol
---/6,000 CBM
9/9/24 - 9/23/24
Sulphur
7,000 MT/---
9/10/24 - 9/24/24
Sulphur
7,000 MT/---
9/10/24 - 9/24/24
Sulphur
7,000 MT/---
9/10/24 - 9/24/24
Sulphur
7,000 MT/---
9/10/24 - 9/24/24
Sulphur
7,000 MT/---
9/10/24 - 9/20/24
Sulphur
7,000 MT/---
9/11/24 - 9/21/24
Ethanol
---/5,000 CBM
9/12/24 - 9/26/24
Ethanol
---/6,000 CBM
9/12/24 - 9/26/24
Rapeseed Meal
2,700 MT/---
9/13/24 - 9/27/24
Rapeseed Meal
3,300 MT/---
9/13/24 - 9/27/24
Rapeseed Meal
2,700 MT/---
9/13/24 - 9/27/24
Rapeseed Meal
3,300 MT/---
9/13/24 - 9/27/24
Rapeseed Meal
2,700 MT/---
9/13/24 - 9/27/24
Rapeseed Meal
3,300 MT/---
9/13/24 - 9/27/24
Rapeseed Meal
2,700 MT/---
9/13/24 - 9/27/24
Rapeseed Meal
3,300 MT/---
9/13/24 - 9/27/24
Ethanol
---/5,000 CBM
9/13/24 - 9/27/24
Ethanol
---/6,000 CBM
9/13/24 - 9/27/24
Corn
7,000 MT/---
9/13/24 - 9/27/24
Corn
7,000 MT/---
9/13/24 - 9/27/24
Corn
7,000 MT/---
9/13/24 - 9/27/24
Corn
7,000 MT/---
9/13/24 - 9/27/24
Corn
7,000 MT/---
9/13/24 - 9/27/24
Rapeseed Meal
3,000 MT/---
9/13/24 - 9/20/24
Rapeseed Meal
3,000 MT/---
9/13/24 - 9/20/24
Rapeseed Meal
3,000 MT/---
9/13/24 - 9/20/24
Wire Rod
3,900 MT/---
9/30/24 - 10/1/24
Wire Rod
4,050 MT/---
9/30/24 - 10/1/24
Wire Rod
3,900 MT/---
9/30/24 - 10/1/24
Wire Rod
4,050 MT/---
9/30/24 - 10/1/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars & Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars & Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,600 MT/---
10/1/24 - 10/3/24
Rebars and Coils
3,700 MT/---
10/1/24 - 10/3/24
Steel Girders and Beams
10,000 MT/30,000 CBM
5/1/25 - 5/31/25
Steel Girders and Beams
10,000 MT/25,000 CBM
5/1/25 - 5/31/25
Connecting to SHIPNEXT Network...