The shipping platform

manage your shipping data, trade and automate work-flows
Escravos Oil Terminal (Nigeria)
NGESC UN LOCODE
5.5166° / 5.0000° Latitude / Longitude

Port Restrictions

Max draft: 21.3

Mean Tide: 1

AVAILABLE LIFT AND CRANES

0-24mt 25-49mt 50-99mt 100-149mt 150+mt

General Description

Location: Escravos Terminal is situated approx 9.5nm offshore, close W of the River Niger delta. General overview: The terminal, operated by Chevron Nigeria Ltd, consists of a fixed platform with two SBM's for loading export crude and an LPG FSO. SBM No 2 is off the mouth of the Escravos River in position 05°30.4'N 004°59.3'E. SBM No 3 is situated 3.2nm W of SBM No 2 in position 05°29.3'N 004°55.5'E. The LPG FSO is situated 4nm WNW of SBM No 3 in position 05°31.7'N 004°51.6'E. A gas pipeline extends in an E'ly direction from this position. Load line zone: Tropical. Max size: Depth LOA Beam BCM Draught (m) (m) (m) (m) (m) SBM No 2: Tankers up to 286,000DWT 20.7 365 61 183 15.8 286,000-308,000DWT 20.7 365 61 183 15.0 VMAX tankers 20.7 365 70 183 15.5 SBM No 3: All tankers (incl VMAX) 30.5 365 61(70) 183 22.5 LPG-FSO: 42.0 N/A N/A N/A N/A Max displacement at SBM No 3 is 350,000t.

AVAILABLE FACILITIES

  • Liquid
  • LPG
Status

Berths and terminals in port

NAME
CARGO
AVG WAITING TIME
LOA
DEPTH
No results
Weather in port
Forecast
Temperature
Wind Speed
Wind Direction
Precipitation
Tue 17
forecast-image
24 - 30°C
16.6 km/h
Warrow
100%
Wed 18
forecast-image
24 - 29°C
13.7 km/h
WSWarrow
100%
Today
forecast-image
25 - 27°C
19.1 km/h
WSWarrow
92%
Fri 20
forecast-image
25 - 27°C
22.7 km/h
Warrow
90%
Sat 21
forecast-image
25 - 28°C
22.3 km/h
Warrow
89%
Sun 22
forecast-image
25 - 28°C
23.8 km/h
SWarrow
86%
Mon 23
forecast-image
25 - 28°C
19.8 km/h
SWarrow
88%

NEARBY FLEET

PLANNED VESSELS

Name
DWT
BLT
DEPARTURE
ARRIVAL
SIENNA
Position9336971 / TANK

149,847 MT

2007

Escravos Oil Terminal
9/14/2024 11:29
Escravos Oil Terminal
9/17/2024 05:00
TORM EMMA
Position9592680 / TANK

75,022 MT

2012

Lome
9/18/2024 02:34
Escravos Oil Terminal
9/19/2024 07:00
ROYAL OAK
Position9164213 / TANK

71,345 MT

1999

Mjimwema Oil Terminal
7/30/2024 18:52
Escravos Oil Terminal
8/22/2024 12:00
IGBINOSA
Position8619429 / TANK

35,644 MT

1988

Burutu
9/7/2024 09:27
EKEREMOR
9/10/2024 08:30
KINGIS
Position9210892 / TANK

37,026 MT

2001

ARMGUARDS ON BOARD
8/17/2024 17:06
JANE ASPHALT
Position9459577 / TANK

6,033 MT

2008

Lome
9/18/2024 17:01
Escravos Oil Terminal
9/19/2024 23:00
SANTA MARIA
Position9656450 / TANK

3,570 MT

2012

Escravos Oil Terminal
9/15/2024 12:59
ARMED GUARDS ONBOARD
9/15/2024 18:00
ROYAL TREASURE
Position7910826 / TANK

3,679 MT

1979

Escravos Oil Terminal
2/17/2024 11:03
Lagos
2/20/2024 14:00
ST AMRAH
Position9273624 / TANK

46,205 MT

2004

Apapa
9/12/2024 14:41
Escravos Oil Terminal
9/13/2024 08:00
BISKRA
Position9030709 / TANK

12,509 MT

1993

Sapele
9/19/2024 10:34
Lagos
9/21/2024 05:00
VISAKHA
Position8703036 / TANK

3,527 MT

1987

Forcados Oil Terminal
1/20/2022 07:40
Koko
7/21/2024 01:00
ULTIMATE
Position9232591 / TANK

69,697 MT

2002

Forcados Oil Terminal
5/20/2022 02:52
Forcados Oil Terminal
12/26/2023 14:00
IMKE
Position9501899 / MPP

9,962 MT

2010

Warri
9/11/2024 09:46
Escravos Oil Terminal
9/16/2024 08:00
LESTE
Position9285720 / TANK

46,803 MT

2004

Tin Can Island
9/13/2024 10:01
Lagos
9/13/2024 22:30
POSEIDON.GR
Position9760067 / BULK

60,432 MT

2016

Lome
9/11/2024 18:36
Warri
9/12/2024 20:00
BONDI
Position9494216 / TANK

15,160 MT

2009

Koko
2/17/2024 10:10
Koko
2/23/2024 17:00
ALMI VOYAGER
Position9579585 / TANK

157,638 MT

2014

Forcados Oil Terminal
9/10/2024 19:00
PLANNED CARGOES
No results
Connecting to SHIPNEXT Network...